You hired a general contractor with hotel experience. They understand that the property may stay open during construction. They’ve worked through PIPs, guestroom renovations, brand requirements, tight schedules, and floors that need to get back into inventory.

That’s a good start. (To read more, check out: 6 Differences Between Hotel Construction Contractors and General Contractors (and Why It’s Crucial for Renovations and PIPs.)

Then the project gets underway, and the people actually touching the building include electricians, plumbers, painters, flooring installers, millworkers, countertop fabricators, FF&E installers, and any number of other construction subcontractors and suppliers.

That’s where hotel experience starts to matter at another level.

At Axis Hospitality Construction, we’ve spent years building relationships with skilled contractors. Some of those relationships go back project after project and city after city. 

It isn’t just that they know how to install an outlet, build a cabinet, or set a plumbing fixture. They do, and they’re very good at their jobs. But the most important thing is that they know how to do their jobs in a hospitality environment.

1. The Work Itself Is Only Part of the Job

I recently had a conversation with Mike Donahue, an electrician who has spent decades doing hospitality work.

Electrical work is electrical work. The drawings tell you where the fixtures go. There’s a code to follow. You know how to wire a room.

Now put that electrician in an operating hotel.

The hotel is selling the floors below the construction area. The general manager is dealing with guests. Engineering needs to know when power is coming down. FF&E is showing up. Crews have a window to make noise. The project is moving from one floor to another, and rooms need to get turned back over quickly.

During our conversation, we landed on something I’ve believed for a long time: a lot of the time, the physical construction is the straightforward part of an occupied hotel renovation.

It’s everything around it that requires experience.

A construction subcontractor who has spent years in hotels has probably dealt with those situations before. That familiarity changes the conversation from the first day on site.

On the job site, communication is key. For lessons we’ve learned about contractor communication, read here: 7 Hard-Won Lessons About Contractor Communication During Hotel Renovations.

2. Hotel Engineering Becomes Part of the Team

There’s usually someone at the property who knows that building better than anyone else on the job.

It might be the chief engineer. It might be someone who has spent 15 years keeping that hotel running and knows exactly which valve controls which stack, which panel was changed three renovations ago, and which service elevator has a habit of doing something strange every Tuesday afternoon.

You want the people working in the building to respect that knowledge.

Mike Donahue described it well on the podcast. When he comes into a hotel, he treats the engineer like the person whose building it is, because that’s exactly what it is. The contractor is there temporarily. Engineering will still be there long after the last construction trailer leaves.

That relationship becomes practical pretty quickly.

Maybe engineering shows the electrician a better place to stage materials. Someone calls when a delivery arrives. They coordinate an electrical shutdown. The crew gets access to an area without sending three people around the building looking for a key.

Those little conversations happen all day on a hotel renovation.

3. Repetition Can Magnify a Missed Detail

Hotels have a strange combination of repetition and complexity.

A guestroom renovation might involve 150 rooms with essentially the same vanity. That sounds straightforward.

It also means a mistake can show up 150 times.

I remember something that Cory Thomas, one of the millwork partners we work with, told me. He talked about what happens when a company unfamiliar with hotels prices a millwork package. A piece of acrylic, glass, metal, or another component may technically sit outside what somebody thinks of as “millwork,” while still being required to deliver the finished package shown in the design.

Someone who works in hotels regularly is more likely to recognize those pieces because they’ve seen the same brands, designs, and specifications before.

Measurements are another example.

One vanity being off is a problem.

One hundred vanities being off is a much longer week.

Hotel-focused specialty contractors and vendors tend to understand why field measurements, model rooms, shop drawings, approvals, and prototype conditions get so much attention before production ramps up.

There are a lot of repeated rooms behind that first one.

4. A Hotel Schedule Moves Differently

Most hotels don’t hand a contractor the keys and say, “Call us in four months.”

You may get the fourth floor.

Finish it.

Give it back.

Move to the third.

Meanwhile, the hotel is still selling rooms on the floors underneath you.

That affects nearly every trade on the project.

The flooring company needs to know when rooms will actually be ready. The millwork manufacturer needs to know which floor is being released first. Plumbing may need access above or below the rooms in the current phase. FF&E installers need rooms sufficiently complete before furniture starts coming through the door.

One hospitality millwork partner, Cory Thomas, talks about how understanding project phasing is part of understanding hotels. The question isn’t simply when the product is manufactured. It’s which floor is first, when that floor needs it, and how the hotel needs the project to move.

That experience is valuable because construction schedules have a way of changing.

We’ve certainly never been involved with a construction project where everything happened exactly as originally planned. I’m still waiting to see that one.

The important part is having people who understand what the change means for everyone behind them.

As hospitality renovation general contractors, occupied hotel renovations are our bread and butter. For a closer look at our process, read here: The Art of Phased Hotel Renovation: Step-by-Step Guide to Keeping Your Hotel Open and Profitable.

5. Brand Standards Can Reach All the Way Down to the Trade Level

A branded hotel renovation adds another layer.

The owner has expectations. The designer has a vision. The GC has a scope. The brand has standards.

A millworker may need to understand a specific cabinet construction. A plumbing supplier may be working from an approved fixture package. An installer may be dealing with exact mounting conditions or finishes that were reviewed through a model room.

This is an area where experience saves a lot of questions.

Cory Thomas put it pretty simply: companies working on hotels need to understand what the brand expects, what ownership expects, and what the design actually calls for.

That doesn’t mean someone has memorized every Marriott, Hilton, Hyatt, or boutique standard ever written.

Nobody has.

It means they understand the process. They know when something looks unusual enough to ask about it. They understand why an approval matters before producing 100 pieces. They know that a finish that looks “close enough” may still create a problem when the model room gets reviewed.

Familiarity with PIPs and brand standards is something you really want when it comes to contractors. For more information, take a look at: 6 Mistakes to Avoid When Hiring Hotel Renovation Contractors.

6. Hospitality Experience Matters Outside the Guestroom Too

Guestrooms tend to get most of the attention because there are so many of them.

The public spaces are where specialty trade contractors can encounter some of the most custom work.

Front desks. Bars. Feature walls. Restaurants. Meeting rooms. Ballrooms. Lobbies.

Those spaces might involve custom millwork, stone, decorative metals, lighting, electrical, plumbing, flooring, wallcovering, and equipment all occupying the same relatively small area.

Cory Thomas described hotel public areas as some of the more interesting work they produce because the designs can get pretty far outside the standard box.

That creativity is part of what makes hotels fun to renovate.

It also means the construction trade partners working in those spaces need to communicate with each other. A beautiful front desk doesn’t help much if the electrical rough-in is six inches away from where the final shop drawing puts the equipment.

Sometimes those things happen anyway. Construction has plenty of imperfect moments.

The difference is how quickly the people involved recognize the issue, pick up the phone, and figure out the next move.

7. The Best Teams Tend to Get Better Together

There’s a reason relationships come up so often when I talk to people in this business.

George Melnyk, a longtime partner, talked on our podcast about electricians, plumbers, painters, millworkers, and the larger group of subcontractors that ultimately has to work together for a project to come together.

I think there’s something to that.

You learn people over time.

You learn who calls back. Who tells you about a problem while there’s still time to do something about it. Who understands that the hotel needs a floor returned Friday. Who can travel when a project is 800 miles away. Who knows how your superintendents operate. Who has worked with the same brands and designers before.

And they learn about you too.

One of our longtime electrical partners, Mike Donahue, talked on our podcast about knowing that when challenges came up, we could pick up the phone and work through them. He also pointed out something that probably matters more than any construction slogan: projects aren’t perfect. What matters is having people willing to deal honestly with what comes up.

That takes time to build.

Multiple construction subcontractors may be working in the same area or moving through the same back-of-house spaces, which makes coordination and clearly defined responsibilities especially important. OSHA provides guidance on multi-employer worksites, including how responsibilities can apply when employees from several employers share a construction site. 

Your General Contractor Is Only One Part of the Team

There are plenty of talented electricians, plumbers, millworkers, painters, flooring installers, and other construction subcontractors who work across commercial construction.

Hotel renovations simply ask some different things of them.

You’re working around people sleeping one floor down. The engineer needs advance notice before a shutdown. A hundred identical pieces need to fit a hundred slightly different existing conditions. Brand requirements have to make their way from a drawing to the finished room. Deliveries, crews, FF&E, inspections, housekeeping, and hotel operations are all sharing the same building.

Over the years, Axis Hospitality Construction has been fortunate to build relationships with hospitality contractors, suppliers, manufacturers, installers, and tradespeople who understand that environment.

Some of them have even sat across from me on the Axis Hospitality Podcast and talked publicly about the work they do, the mistakes they’ve made, the things they’ve learned, and why they keep working in hotels.

In a way, those conversations have become part of our résumé.

You can hear the people behind the projects explain how they think about the work.

And when you’re trusting a team to renovate a hotel that’s still welcoming guests every night, the people behind the project matter quite a bit.

If you have a hotel renovation project, we have the team for it. Contact us today!